How does the interconnection process work?

Interconnection with PRECO’s electric distribution grid is a simple 1-2-3 process:

  1. Complete the forms found on our Solar System Interconnection Forms webpage
  2. Submit all required documents along with any applicable fees
  3. Upon approval of your application and installation of your system, PRECO will go to your location to perform an onsite inspection and install your new specialized meter

Occasionally, PRECO may be required to perform routine inspections or audits to ensure your system is performing as recorded and inspect for any additions or changes that may have been made.